Therma-Tru Fiber-Classic Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para não Therma-Tru Fiber-Classic. Therma-Tru Fiber-Classic User's Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 24
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
PATIO
DOOR
SYSTEMS
Therma-Tru
Fiber-Classic
and
Smooth-Star
Sliding Patio
Door System
®
®
®
Double Unit
Assembly & Installation
Read all instructions before starting.
The applicable standards for these products are governed by
the International Residential Code.
Copies of performance ratings and testing are available on our website
www.thermatru.com and our product manual.
Vista de página 0
1 2 3 4 5 6 ... 23 24

Resumo do Conteúdo

Página 1 - Assembly & Installation

PATIODOORSYSTEMSTherma-TruFiber-ClassicandSmooth-StarSliding PatioDoor System®®®Double UnitAssembly & InstallationRead all instructions before sta

Página 2

91213#8 x 3 Pan Head Screws"The sill's center screw needsto be installed three inchesoff center in the direction ofthe active panel.Using (1

Página 3 - SCREW CHART

10INSTALL STATIONARY PANELINSTALL ANCHOR BLOCKS141512From exterior side of system, installstationary panel by inserting top ofpanel up into exterior c

Página 4 - Frame Assembly

ADJUST ROLLERS17Using a screw driver, turn adjustmentscrews in rollers left or right until panelis level and glides smoothly across thetrack.Close pan

Página 5 - ATTACH HEAD TO JAMBS

12INSTALL ACTIVE INTERLOCK19Active interlockKerfsButt active interlock up againsthead jamb leaving a slight gapof approximately 1/64” betweenhead jamb

Página 6 - DRIP CAP INSTALLATION

HANDLE INSTALLATION21Refer to instructions supplied with handle set kit.ATTACH STRIKE PLATE22Align slots in strike plate to pre-drilledholes in active

Página 7 - Frame Installation

PREP DOOR FOR FOOT BOLT23Tear out template on page 16 to locate and drill holes for foot bolt.Locate template on interior side of active panel towards

Página 8 - SET UNIT INTO ROUGH OPENING

15INSTALL FOOT BOLT KEEPERINSERT PLUGSATTACH JAMB COVERSLIDING SCREEN DOOR26272829Close the active door completely.Align notch in keeper with foot bol

Página 9 - PLUMB SIDE JAMBS

16Active panel edgeBottom door edge1/8” dia holes1” deepBottom cornerof active panelTowardsinactivepanelTowardsinactivepanel

Página 11 - INSTALL ANCHOR BLOCKS

181. Sand the surface to be re-coated with 180 grit sandpaper to abrade and make porous.2. Remove all sanding dust from the surface. This can be accom

Página 12 - INSTALL ACTIVE PANEL

1The following packages are needed to complete the installation of yourSliding Patio Door System.Therma-Tru®Check all components for correct size and

Página 13 - ATTACH INACTIVE INTERLOCK

19JAMB EXTENSION INFORMATIONThe following images are intended to help clarify how a patio door isinstalled in different frame openings.The jamb extens

Página 14 - INSERT PANEL BUMPER

31” 31”5” 5”5”5”13”6 1/4” 6 1/4”1”1”20INTERIOR CASING ATTACHMENTInterior casing may be attached to the frame in either of the following ways:An air na

Página 15 - INSTALL SILL CAP TOP

21SIZING INFORMATIONGridsWidth Height Width Height # of Lites5/0 x R.H. XO or OX 59 1/4 79 1/2 60 80 10 or 156/0 x R.H. XO or OX 71 1/4 79 1/2 72 80 1

Página 16 - SLIDING SCREEN DOOR

22DOOR HANDING GUIDELeft HandRight HandViewed from exterior

Página 17

1687 Woodlands Dr. Maumee, OH 435371-800-THERMATRU (843-7628)www.thermatru.comPATIODOORSYSTEMS© 2005 Therma-Tru Corp.Therma-Tru Doors is an operating

Página 18

2#10 x 3" Flat Head Screw#8 x 3" Pan Head Screw#10 x 2 Pan Head Screw½#10 x 1 Pan Head Screw½"#8 x 1 S.S. Pan Head Screw½"#8 x 1 3

Página 19 - REPAINTING PROCEDURE

3NOTE:A large work area is needed to assemble the frame kit. Cover area withcardboard from one or more door panel cartons to protect frame partsand fl

Página 20 - JAMB EXTENSION INFORMATION

ATTACH SILL TO JAMBSATTACH HEAD TO JAMBS45NOTE: Be sure that foam pads are in place before assembling frame.Apply sealant to sill and sidejambs as sho

Página 21 - INTERIOR CASING ATTACHMENT

5Place drip cap on top of head jamb.Place head sealing fin on top of drip cap, engaging slot insealing fin with flange on drip cap.Staple head sealing

Página 22 - SIZING INFORMATION

6Check rough opening as follows and correct if necessary:• Sub-floor to be flat, level, and clean. Sill must be supported throughoutits entire length.

Página 23 - DOOR HANDING GUIDE

7APPLY SILICONE SEALANT TO SILL AND FINSSET UNIT INTO ROUGH OPENING89NOTE:CONTINUOUS BEADS OFSEALANT ARE REQUIRED.Run continuous beads of sealantacros

Página 24 - 1-800-THERMATRU (843-7628)

8LEVEL SILLPLUMB SIDE JAMBS1011Sill be flat and level.Check and make any necessary adjustments.If necessary, add temporary blocking underprojecting ex

Comentários a estes Manuais

Sem comentários